AJ Power and Perkins joined forces to provide the 5000 kVA of back-up power required by a data centre in South Africa to safeguard business continuity and keep data flowing 24/7.
Coelmo has completed the design, production and commissioning of a 2250 kVA Generating Set equipped with a 1500 V medium voltage alternator and 40-foot container installed on a 3-axle semi-trailer.
Twelve MTU Kinetic PowerPacks will be delivered to King Abdullah University for Science and Technology (KAUST). From design, manufacturing, full installation at site, commissioning to full integrated testing.
Bells Power reports the successful installation of an FG Wilson P400-3 genset within a sound-attenuated canopy delivered to the roof level of a new project located near to Marble Arch in the heart of London.