Coelmo has completed the design, production and commissioning of a 2250 kVA Generating Set equipped with a 1500 V medium voltage alternator and 40-foot container installed on a 3-axle semi-trailer.
The technology group Wärtsilä will supply a 25MW/100MWh energy storage system under an extended equipment delivery and a long-term service agreement in Belgium.
Twelve MTU Kinetic PowerPacks will be delivered to King Abdullah University for Science and Technology (KAUST). From design, manufacturing, full installation at site, commissioning to full integrated testing.
The PowerEx Live Conference & Exhibition held on October 6th at the Plaza Hotel, Westminster, London, was very well-received by power professionals from the genset and CHP sectors and enjoyed two lively all-day Conference sessions.