B
rugg Systemy Rurowe Poland has delivered two 40m long pieces of the flexible preinsulated pipe – Flexwell FHK200/310 DN150 - to the construction site of a district heating network located near the near Kubicki Arcades at the Royal Castle in Warsaw, Poland. The order was placed by Veolia Energia Warszawa S.A. The main contractor, PHU Instaleks from Żyrardów installed the Flexwell cable while Brugg service engineers installed welded couplings on all cable ends.
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.
More from
CHP
View All
Join Our Newsletter and Get the Latest
Posts to Your Inbox
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.