Electra Molins has supplied 1 x 2,500 kVA with Baudouin engine 20M33 and Mecc Alte alternator controlled by a MP15 for paralleling with a different genset for Institut Català d'Oncologia-Hospital Duran i Reynals.
With soaring traffic on its platform, Naver has embarked on a project to construct one of Asia’s largest data centres which will be developed over six phases using a substantial volume of generator sets.