D

oosan Škoda Power, the Pilsen steam turbine manufacturer will supply two 50MW steam turbines, including other parts of additional technology and equipment, for one of the most modern power generating plant in Indonesia. The project site is located in a seismically active area and during the execution Doosan Škoda Power used its rich experience from similar projects it had previously installed in Indonesia, Chile and Saudi Arabia. Deliveries to the construction site will take place in mid-2021 and will be followed by assembly work under expert supervision of Doosan Škoda Power. The first steam is expected to be invited to the turbines in 2023.

Posted 
Aug 14, 2020
 in 
Gensets
 category
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.

More from 

Gensets

View All

Join Our Newsletter and Get the Latest
Posts to Your Inbox

No spam ever. Read our Privacy Policy
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.