oosan Škoda Power, the Pilsen steam turbine manufacturer will supply two 50MW steam turbines, including other parts of additional technology and equipment, for one of the most modern power generating plant in Indonesia. The project site is located in a seismically active area and during the execution Doosan Škoda Power used its rich experience from similar projects it had previously installed in Indonesia, Chile and Saudi Arabia. Deliveries to the construction site will take place in mid-2021 and will be followed by assembly work under expert supervision of Doosan Škoda Power. The first steam is expected to be invited to the turbines in 2023.