Doosan Škoda Power has successfully installed and launched a DST-S20 steam turbine with an output of 200 MW, along with operational equipment, at the Punta del Tigre combined gas-steam cycle power plant in Uruguay.
COELMO has been involved in the design, supply, installation and commissioning of three generator sets offering 1000 kVA (800KW), 400 / 230V, 50Hz, 1500 rpm respectively for a power station based in Matera, Italy.